Showcase · Site progress time-machine

Stand on site.Scrub through time.

We capture your site in 360° on a fixed cadence, run AI extraction over every visit, and hand you a link. Stand in any zone, drag the date, and watch the same corner get built — with the progress notes and the snag register attached to the frame they came from.

Try the demo
The demo · 3 zones × 3 visits

Same corner. Three months. One drag.

Drag inside the frame to look around. Slide the capture date and the sphere changes underneath you while the camera stays put — that is the whole trick, and it is the reason a recurring capture is worth more than the sum of its visits. Gold points are what the extraction pass found; grey ones are open snags. Everything below the frame works with the viewer switched off.

Kyalami Commercial Fit-Out — Block C is an illustrative project, not a client. The spheres are CC0 stand-ins — three different real spaces standing in for three visits to one zone — and the notes are a worked example of what the extraction pass produces, written against what is actually in each frame.

360° capture of Reception & Lobby on 14 May 2026 — Shell only: brickwork up, roof deck on, no floor build-up.
3 zones · 3 capture datesDrag to look around. Slide the date to watch the same corner get built. Nothing downloads until you press play.
Capture dateVisit 01 of 3 · 18% complete

360° imagery: Poly Haven (CC0) — stand-in captures. Real projects are captured on a DJI Osmo 360. Monthly, same standing points, same time of day.

Visit 01 · 14 May 2026Reception & Lobby · Strip-out & shell

Shell only: brickwork up, roof deck on, no floor build-up.

Estimated complete18%

The zone is a bare masonry shell. Column formwork clamps are still on the four internal columns, the roof deck is closed but unlined, and the entrance elevation is an open glazing band with no temporary sheeting. The floor is sub-base and brick rubble — no blinding, no screed. A blockwork partition on the west side is up to full height and marks out the future back-of-house.

Progress notes
  • Perimeter brickwork complete to underside of the roof deck
  • Four internal columns cast; formwork clamps still fitted
  • Ribbed metal roof deck closed, no ceiling or insulation
  • Glazing band open — frames not delivered
  • Floor at sub-base level, brick rubble not cleared
Pinned in this sphere
  • Columns cast, formwork on
  • REC-01 · Openings unsealed
  • REC-02 · Sub-floor level
  • Back-of-house partition
Opening position
  • REC-01 raised window openings unsealed — water ingress to the shell
  • REC-02 raised slab level uneven across the entrance line
Open at this date · 2
  • REC-01Critical · Main contractorOpen

    Window openings unsealed — water ingress to the shell

    The full glazing band on the entrance elevation is still an open opening with no temporary sheeting. Rain reaches the slab and the base of the brickwork, which puts the screed programme at risk.

  • REC-02Major · GroundworksOpen

    Slab level uneven across the entrance line

    Standing water and a visible fall in the sub-floor along the entrance line. Needs confirming against the floor build-up before the screed goes down, or the finished threshold will not meet the door line.

Every zone, every visit — the shareable record
Zone 1 of 3

Reception & Lobby

Ground-floor entrance, reception counter, lobby seating and the stair core.

  1. 360° capture of Reception & Lobby on 14 May 2026 — Shell only: brickwork up, roof deck on, no floor build-up.
    14 May 202618%
    Visit 01 · Strip-out & shell

    Shell only: brickwork up, roof deck on, no floor build-up.

  2. 360° capture of Reception & Lobby on 18 June 2026 — Glazed, plastered and screeded. First-fix electrical in, no finishes.
    18 June 202654%
    Visit 02 · First fix & finishes

    Glazed, plastered and screeded. First-fix electrical in, no finishes.

  3. 360° capture of Reception & Lobby on 23 July 2026 — Finishes complete and lit. Counter, seating and stair balustrade in.
    23 July 202691%
    Visit 03 · Second fix & handover

    Finishes complete and lit. Counter, seating and stair balustrade in.

Snag register · status at 23 July 2026
  • REC-01Critical · Main contractorResolved

    Window openings unsealed — water ingress to the shell

    Raised 14 May 2026

  • REC-02Major · GroundworksResolved

    Slab level uneven across the entrance line

    Raised 14 May 2026

  • REC-03Minor · ElectricalOpen

    Socket boxes set low on the north wall

    Raised 18 June 2026

Zone 2 of 3

Open-Plan Floor

The main 640 m² workspace floor plate, its perimeter glazing and the ceiling services above it.

  1. 360° capture of Open-Plan Floor on 14 May 2026 — Strip-out complete. Existing structure exposed, floor unformed.
    14 May 202612%
    Visit 01 · Strip-out & shell

    Strip-out complete. Existing structure exposed, floor unformed.

  2. 360° capture of Open-Plan Floor on 18 June 2026 — Roof closed, walls painted, glazing in, screed down but dirty.
    18 June 202647%
    Visit 02 · First fix & finishes

    Roof closed, walls painted, glazing in, screed down but dirty.

  3. 360° capture of Open-Plan Floor on 23 July 2026 — Fitted out and occupied — but the floor boxes are not live.
    23 July 202688%
    Visit 03 · Second fix & handover

    Fitted out and occupied — but the floor boxes are not live.

Snag register · status at 23 July 2026
  • OPF-01Critical · RoofingResolved

    Daylight visible at the roof ridge

    Raised 14 May 2026

  • OPF-02Major · Main contractorResolved

    Debris and laitance across the screed

    Raised 18 June 2026

  • OPF-03Major · ElectricalOpen

    Desk power run on the surface — floor boxes not live

    Raised 23 July 2026

Zone 3 of 3

Plant Room

Basement plant room: incoming services, switchboard wall, pump skid and the distribution route to both floors.

  1. 360° capture of Plant Room on 14 May 2026 — Room stripped, first pipe drop run, corridor still storing debris.
    14 May 202615%
    Visit 01 · Strip-out & shell

    Room stripped, first pipe drop run, corridor still storing debris.

  2. 360° capture of Plant Room on 18 June 2026 — Switchboard wall built and boarded. Room finishes half done.
    18 June 202652%
    Visit 02 · First fix & finishes

    Switchboard wall built and boarded. Room finishes half done.

  3. 360° capture of Plant Room on 23 July 2026 — Plant set, pipework run and painted, control panels in.
    23 July 202686%
    Visit 03 · Second fix & handover

    Plant set, pipework run and painted, control panels in.

Snag register · status at 23 July 2026
  • PLT-01Major · Main contractorResolved

    Escape route obstructed by stored debris

    Raised 14 May 2026

  • PLT-02Major · ElectricalResolved

    Switchboard fixed before the wall finish

    Raised 18 June 2026

  • PLT-03Minor · MechanicalOpen

    Pipework identification incomplete at the pump skid

    Raised 23 July 2026

What you actually get

A visit, a link, and a record you keep.

Six deliverables, on a cadence you set. No seats to license, no per-space fee, and nothing that stops working the month you stop paying.

Every visit

A capture visit on your cadence

Monthly on most projects, weekly when the programme is tight. One operator, a couple of hours on site, the same standing points every time. No scaffolding, no shutdown, nobody stops work.

48 hours later

A shareable walkthrough link

One URL, no app, no seat licences. Stand in any zone, scrub the date, look wherever you want. It opens on a phone in a site meeting and it survives being forwarded to someone who has never heard of us.

Every visit

AI progress notes per zone

A written observation set and a completion estimate for each zone, drafted from the spheres and reviewed by a human before it ships. Paste-ready for the monthly report you are already writing.

Carried forward

A snag register with history

Every snag keeps its reference, its severity and its trade from the visit it was raised to the visit it was closed — with the frame it was seen in attached. “Show me it open in June” takes one click.

On request

Before-and-after pairs for claims

Any two dates in a zone, exported as a matched pair from the same standing point with the capture dates burned in. What a delay or variation claim needs, without a photographer’s word against yours.

At handover

The handover archive

The full set of dated captures and notes, exported and handed over with the O&M pack. It is yours: the files, the notes and the page. Nothing goes dark when the project closes and the invoices stop.

How it is made

Capture, align, extract, share.

The capture takes an afternoon and nobody has to stop working. The rest is a pipeline we run — the same one behind our 360° venue walkthroughs, with a date axis and an extraction pass on top of it.

  1. 01

    Capture visit

    One walk of the site on a DJI Osmo 360, on the cadence you pick. Same standing points every visit, marked once on the floor plan, so the frames actually line up month to month.

  2. 02

    Align

    Each sphere is levelled, colour-matched and pinned to its zone and its date. Alignment is the boring step that makes the scrub work — a capture that drifts is a capture you cannot compare.

  3. 03

    AI extraction

    A vision pass reads every sphere and writes what changed: progress notes, a completion estimate, and snags with a severity and a trade against them. Your site team edits the draft; nobody types a register from scratch.

  4. 04

    Share

    The result is a link. Zones down one side, dates along the bottom, notes attached to the frame they came from — open on a phone in a site meeting or forward it to a lender.

Four ways to know what your site looks like

You are already paying for this. Usually in trips.

The default

Drive out and look

The most trusted method there is, and the most expensive. It only tells you about the day you were standing there.

The usual fallback

A folder of site photos

Cheap, universal, and unsearchable by month three. Nobody can tell you what the frame to the left of that photo showed.

The heavy option

A laser-scan digital twin

Millimetre-accurate and genuinely the right tool for clash detection and as-builts. It is also slow, costly and rarely run monthly.

This page

Site Progress Time-Machine

A recurring 360° capture with AI extraction over it, delivered as a link you own. Not a survey instrument — a dated record of the whole space.

  • What it costs to know how the site looks today

    Drive out and lookHalf a day and a tank of fuel per person, per look. Consultants bill the trip whether or not anything moved.

    A folder of site photosAlmost nothing to take, and a lot of somebody's time to find anything in later.

    A laser-scan digital twinA specialist crew and a processing turnaround. Priced per scan, which is why nobody runs one monthly.

    Site Progress Time-MachineOne operator, a couple of hours on site, on a fixed monthly fee. Everyone who needs to look, looks — no extra trips.

  • Proving progress to a lender or a client

    Drive out and lookYour word, plus whoever else made the trip. Hard to forward, impossible to revisit.

    A folder of site photosA dated JPEG of the corner someone thought to shoot. It proves that corner and nothing around it.

    A laser-scan digital twinRock-solid evidence, at a cost and turnaround that suits a milestone, not a monthly draw-down.

    Site Progress Time-MachineA dated sphere of the whole zone with the notes attached. They stand where you stood and look wherever they want.

  • Answering “what was behind that wall in June?”

    Drive out and lookNot answerable. The wall is closed and the visit is over.

    A folder of site photosOnly if someone happened to photograph exactly that, and only if you can find it.

    A laser-scan digital twinAnswerable if a scan was run that month at that level of detail. Usually it was not.

    Site Progress Time-MachineScrub the zone back to June and look up. The first-fix services are in the frame whether or not anyone thought to photograph them.

  • Tracking a snag from raised to closed

    Drive out and lookA spreadsheet and someone's memory of the site walk.

    A folder of site photosA spreadsheet, plus two photos that may or may not be the same place.

    A laser-scan digital twinNot what it is for. Scans capture geometry, not a register.

    Site Progress Time-MachineEach snag keeps its reference, severity and trade across every visit, with the frame it was seen in attached to each status change.

  • Dimensional accuracy

    Drive out and lookA tape measure and a sketch.

    A folder of site photosNone. A photo is not a measurement.

    A laser-scan digital twinMillimetre-grade point cloud. This is the honest winner, and it is not close.

    Site Progress Time-MachineNot a survey instrument. We will say so in the meeting, and if you need as-builts we will tell you to scan it.

  • Who owns it when the project ends

    Drive out and lookNothing to own.

    A folder of site photosYou do, in a folder nobody will open again.

    A laser-scan digital twinDepends on the contract, and often on the vendor’s platform staying paid.

    Site Progress Time-MachineYou do — files, notes and page, handed over with the O&M pack. Nothing goes dark when the invoices stop.

Laser scanning and 360° capture are not competitors — most projects that can afford both should run a scan at the milestones and a 360° capture every month in between. If you only have budget for one and you need as-builts, buy the scan.

What it is not

The three things we would rather you heard from us.

It is not a survey instrument

A 360° sphere is a record, not a measurement. If you need as-built dimensions or clash detection, you need a laser scan — and we will say so rather than sell you this instead.

The extraction is a draft, not a signature

The notes and the completion estimates come out of a vision pass and are reviewed before they ship. They are there to save your team the typing, not to replace their judgement or their sign-off.

It is only as good as the cadence

Monthly captures answer monthly questions. If the thing you need to prove happens in a single week of first fix, capture that week — a record cannot show you what nobody was there to capture.

Bring us a site and a cadence.

Fit-outs, new build, plant upgrades, infrastructure — anywhere the question “what did that look like last month?” costs somebody a trip or an argument. Tell us the zones and how often, and we will tell you what a visit costs.

Already running Aion on the project? The capture record and the meeting record answer different halves of the same question.